19 enregistrements

19 enregistrements

Filtres actifs Tout effacer

Aucun filtre actif

Filtres

[Superseded] Flood Study — Lota Creek — Oct 2014

Attribute
Attribute Description
Comment
1
Hydrology Date
2013
2
Rainfall Design
AR&R 1987
3
Hydraulic Model - 2D
TUFLOW
4
Flood Surfaces
Existing Surfaces (H,D,DxV), Ultimate Surfaces (un-stretched)(H)
H,D and DxV refer to Height, Depth and Hazzard surfaces respectively. The provided Ultimate Scenario flood surfaces are un-stretched. An un-stretched flood surface does not represent the full extent of flooding. Please refer to the Flood Study report for more details
5
Climate Change
1%CC_2050,0.5%CC_2050,1%CC_2100,0.5%CC_2100,0.2%CC_2100
AEP%CC_YYYY refers to Climate Change Scenario for the % AEP flood event for Year YYYY. For more detail refer to Flood Study report
6
Lead Consultant
BCC
7
Study Title
Lota Creek Flood Study
8
Creeks/Tributaries/Waterways
Lota Creek and its tributaries
9
Year Commenced
2012
10
Year Completed
2014
11
Hydrology Model
XP-RAFTS
12
Hydraulic Model - 1D
ESTRY of TUFLOW for structures
13
Model Projection
MGA Zone 56 (GDA94)
14
ALS/LiDAR Date
2009
15
Survey Date
1997, 1999
16
Floodplain Condition
Existing , Ultimate (FPA Flood Corridor)
Floodplain Condition refers to the scenarios modelled as part of the flood study. Please refer to the Flood Study report for more details on each modelled scenario
17
LGA Name
Brisbane City Council (BCC) , Redland City Council (RCC)
18
Hydraulic Date
2013
19
Design Events (%AEP)
50,20,10,5,2,1,0.5,0.2,0.05
Aucun résultat
  ×